Development and Application of Fast Monte Carlo Simulation Method for Beijing τ-Charm Factory (BTCF)
- Received Date: 1900-01-01
- Accepted Date: 1900-01-01
- Available Online: 1997-08-05
Abstract: Based on the existing concept design and the expected performance of the detector at the future τ-charm factory,a fast Monte Carlo simulation program package using the BES software frame and data structure has been devcloped.Vadous important and/or interesting physics issues have been simulated by using this method,and a series of important physics results have been got.The design idea,the program frame,and the advantages of this method have been described.One can conclude that this Monte Carlo simulation method can greatly save CPU and disk space,and is specially suitable for BES users.The physics results obtained from the simulation demonstrate that it is essential to build the BTCF.





Abstract
HTML
Reference
Related
PDF












DownLoad: