×
近期发现有不法分子冒充我刊与作者联系,借此进行欺诈等不法行为,请广大作者加以鉴别,如遇诈骗行为,请第一时间与我刊编辑部联系确认(《中国物理C》(英文)编辑部电话:010-88235947,010-88236950),并作报警处理。
本刊再次郑重声明:
(1)本刊官方网址为cpc.ihep.ac.cn和https://iopscience.iop.org/journal/1674-1137
(2)本刊采编系统作者中心是投稿的唯一路径,该系统为ScholarOne远程稿件采编系统,仅在本刊投稿网网址(https://mc03.manuscriptcentral.com/cpc)设有登录入口。本刊不接受其他方式的投稿,如打印稿投稿、E-mail信箱投稿等,若以此种方式接收投稿均为假冒。
(3)所有投稿均需经过严格的同行评议、编辑加工后方可发表,本刊不存在所谓的“编辑部内部征稿”。如果有人以“编辑部内部人员”名义帮助作者发稿,并收取发表费用,均为假冒。
                  
《中国物理C》(英文)编辑部
2024年10月30日

Construction of a Full-Length Prototype of the BESⅢ Drift Chamber and On-Detector Test for the BESⅢ Drift Chamber Electronics

Get Citation
QIN Zhong-Hua, YAN Zhi-Kang, CHEN Yuan-Bo, WU Ling-Hui, LIU Jian-Bei, CHEN Chang, XU Mei-Hang, WANG Lan, MA Xiao-Yan, JIN Yan, LIU Rong-Guang, TANG Xiao, Construction of a Full-Length Prototype of the BESⅢ Drift Chamber and On-Detector Test for the BESⅢ Drift Chamber Electronics[J]. Chinese Physics C, 2007, 31(4): 371-376.
QIN Zhong-Hua, YAN Zhi-Kang, CHEN Yuan-Bo, WU Ling-Hui, LIU Jian-Bei, CHEN Chang, XU Mei-Hang, WANG Lan, MA Xiao-Yan, JIN Yan, LIU Rong-Guang, TANG Xiao, Construction of a Full-Length Prototype of the BESⅢ Drift Chamber and On-Detector Test for the BESⅢ Drift Chamber Electronics[J]. Chinese Physics C, 2007, 31(4): 371-376. shu
Milestone
Received: 2006-06-16
Revised: 2006-07-07
Article Metric

Article Views(2982)
PDF Downloads(783)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Construction of a Full-Length Prototype of the BESⅢ Drift Chamber and On-Detector Test for the BESⅢ Drift Chamber Electronics

    Corresponding author: QIN Zhong-Hua,
  • Institute of High Energy Physics, CAS, Beijing 100049, China2 Graduate University of Chinese Academy of Sciences, Beijing 100049, China3 Micro-Electronics Laboratory, Department of Physics, Hunan University, Changsha 410082, China

Abstract: A full-length prototype of the BESⅢ drift chamber was built. The experience gained on gas sealing, high voltage supply and front-end electronics installation should be greatly beneficial to the successful construction of the BESⅢ drift chamber. An on-detector test of the BESⅢ drift chamber electronics was carried out with the constructed prototype chamber. The noise performance, drift time and charge measurements, and electronics gains were examined specifically. The final test results indicate that the electronics have a good performance and can satisfy their design requirements.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return