BEPCⅡ Linac Upgrade and Beam Commissioning

Get Citation
WANG Shu-Hong, PEI Guo-Xi, SUN Yao-Lin, CHI Yun-Long, CHEN Yan-Wei, CAO Jian-She, KONG Xiang-Cheng, ZHAO Feng-Li, HOU Mi and DENG Bing-Lin. BEPCⅡ Linac Upgrade and Beam Commissioning[J]. Chinese Physics C, 2006, 30(S1): 150-152.
WANG Shu-Hong, PEI Guo-Xi, SUN Yao-Lin, CHI Yun-Long, CHEN Yan-Wei, CAO Jian-She, KONG Xiang-Cheng, ZHAO Feng-Li, HOU Mi and DENG Bing-Lin. BEPCⅡ Linac Upgrade and Beam Commissioning[J]. Chinese Physics C, 2006, 30(S1): 150-152. shu
Milestone
Received: 2005-12-07
Revised: 1900-01-01
Article Metric

Article Views(3084)
PDF Downloads(651)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

BEPCⅡ Linac Upgrade and Beam Commissioning

    Corresponding author: WANG Shu-Hong,
  • Institute of High Energy Physics, CAS, Beijing 100049, China

Abstract: The BEPCⅡ injector linac upgrade aims at having higher beam energy with smaller beam emittance and energy spread to meet the colliding luminosity upgrade by two orders of magnitudes higher. It is a great challenge to various systems and the beam physics for this injector linac. This paper describes the constructions of the new electron gun, the new positron source, the new RF power supply, the new phasing system and the upgraded beam instrumentation, which are immediately affected on the beam performance. The beam physics with high current and small emittance and energy spread are systematically studied. The preliminary beam commissioning results and the further machine improvement plans are presented.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return