×
近期发现有不法分子冒充我刊与作者联系,借此进行欺诈等不法行为,请广大作者加以鉴别,如遇诈骗行为,请第一时间与我刊编辑部联系确认(《中国物理C》(英文)编辑部电话:010-88235947,010-88236950),并作报警处理。
本刊再次郑重声明:
(1)本刊官方网址为cpc.ihep.ac.cn和https://iopscience.iop.org/journal/1674-1137
(2)本刊采编系统作者中心是投稿的唯一路径,该系统为ScholarOne远程稿件采编系统,仅在本刊投稿网网址(https://mc03.manuscriptcentral.com/cpc)设有登录入口。本刊不接受其他方式的投稿,如打印稿投稿、E-mail信箱投稿等,若以此种方式接收投稿均为假冒。
(3)所有投稿均需经过严格的同行评议、编辑加工后方可发表,本刊不存在所谓的“编辑部内部征稿”。如果有人以“编辑部内部人员”名义帮助作者发稿,并收取发表费用,均为假冒。
                  
《中国物理C》(英文)编辑部
2024年10月30日

Impedance measurements of the extraction kicker system for the rapid cycling synchrotron of China Spallation Neutron Source

  • The fast extraction kicker system is one of the most important accelerator components and the main source of impedance in the Rapid Cycling Synchrotron of the China Spallation Neutron Source. It is necessary to understand the kicker impedance before its installation into the tunnel. Conventional and improved wire methods are employed in the impedance measurement. The experimental results for the kicker impedance are explained by comparison with simulation using CST PARTICLE STUDIO. The simulation and measurement results confirm that the window-frame ferrite geometry and the end plate are the important structures causing coupling impedance. It is proved in the measurements that the mismatching from the power form network to the kicker leads to a serious oscillation sideband of the longitudinal and vertical impedance and the oscillation can be reduced by ferrite absorbing material.
      PCAS:
  • 加载中
  • [1] B. W. Zotter et al, Impedances and Wakes in High-Energy Particle Accelerators(Singapore:World Scientific, 1998), p.73
    [2] A. Chao, Physics of Collective Beam Instabilities in High Energy Accelerator(New York:Wiley Publishing Company, 1993), p. 81-174
    [3] S. Y. Lee, Accelerator Physics(Singapore:World Scientific, 2004), p. 216, 369
    [4] A. Chao and M. Tigner, Handbook of Accelerator Physics and Engineering(Singapore:World Scientific, 1998), p. 194
    [5] A. Faltens et al, An Analog Method for Measuring the Longitudinal Coupling Impedance of a Relativistic Particle Beam with Its Environment, in Proc. of the 8th International Conference on High-Energy Accelerators(1971), p. 338
    [6] M. Sands and J. Rees, A Bench Measurement of the Energy Loss of a Stored Beam to a Cavity, PEP report, PEP-95, 1974
    [7] G. Nassibian et al, Nucl. Instrum, Methods A, 159:21-27(1979)
    [8] L. S. Walling et al, Nucl. Instrum, Methods A, 281:433(1989)
    [9] F. Caspers, Bench Methods for Beam-coupling Impedance Measurement, CERN-report, CERN PS/88-59. 1988
    [10] H. Hahn and F. Pedersen, On Coaxial Wire Measurement of the Longitudinal Coupling Impedance, BNL-report, 50870, 1978
    [11] H. Hahn, PRST-AB, 3:122001(2000)
    [12] T. Toyama et al, Coupling Impedance of the J-PARC Kicker Magnets, in Proc. of HB2006(2006), p. 140
    [13] H. Gang et al, Longitudinal Broadband Impedance Measurement System by Coaxial Line Methods, in Proc. of the PAC'01(2001), p. 2060
    [14] H. Hahn et al, Measured Transverse Coupling Impedance of RHIC Injection and Abort Kickers, in Proc. of the PAC'01(2001), p. 1829
    [15] H. Hahn, PRST-AB, 7:103501(2004)
    [16] B. Podobedov et al, PRST-AB, 9:054401(2006)
    [17] Y. Shobuda et al, Horizontal Impedance of the Kicker Magnet of RCS at J-PARC, in Proc. of IPAC'10(2010), p. 2024
    [18] B. Salvant, Impedance Model of the CERN SPS and Aspects of LHC Single-Bunch Stability, Ph. D Thesis(CERN, 2010)
    [19] S. Wang et al, Scientific China Physics M A, 54:239(2011)
    [20] Y. Liu, High Power Laser and Particle Beams, 25(2):465(2013)(in Chinese)
    [21] J. Y. Tang et al, Extraction System Design for the CSNS/RCS, in Proc. of EPAC'06(2006), p. 1777
    [22] W. Kang et al, IEEE Trans. on App. Sup., 20(3):356(2010)
    [23] Y. Chi et al, Chin. Phys. C, 32(Z1):25(2008)
    [24] Y. Shobuda et al, Nucl. Instrum, Methods A, 713:52(2013)
    [25] F. Caspers, private contact, Oct. 2013
    [26] A.W. Gent, Electrical Comm., 33:234(1956)
    [27] H. Hahn, Direct Transverse Coupling Impedance Measurements of Kicker Magnets, BNL/SNS TECHNICAL NOTE, 120, 2003
    [28] A. Mostacci et al, Bench Measurements of Low Frequency Transverse Impedance, in Proc. of the PAC'03(2003), p. 1801
  • 加载中

Get Citation
Liang-Sheng Huang, Sheng Wang, Yu-Dong Liu, Yong Li, Ren-Hong Liu and Ou-Zheng Xiao. Impedance measurements of the extraction kicker system for the rapid cycling synchrotron of China Spallation Neutron Source[J]. Chinese Physics C, 2016, 40(4): 047002. doi: 10.1088/1674-1137/40/4/047002
Liang-Sheng Huang, Sheng Wang, Yu-Dong Liu, Yong Li, Ren-Hong Liu and Ou-Zheng Xiao. Impedance measurements of the extraction kicker system for the rapid cycling synchrotron of China Spallation Neutron Source[J]. Chinese Physics C, 2016, 40(4): 047002.  doi: 10.1088/1674-1137/40/4/047002 shu
Milestone
Received: 2015-06-29
Revised: 2015-09-21
Fund

    Supported by National Natural Science Foundation of China(11175193, 11275221)

Article Metric

Article Views(1663)
PDF Downloads(80)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Impedance measurements of the extraction kicker system for the rapid cycling synchrotron of China Spallation Neutron Source

    Corresponding author: Yu-Dong Liu,
  • 1. Dongguan Campus, Institute of High Energy Physics(IHEP), Chinese Academy of Sciences(CAS), Dongguan 523803, China
  • 2. Dongguan Institute of Neutron Science(DINS), Dongguan 523808, China
  • 3.  Institute of High Energy Physics, Chinese Academy of Science, Beijing 100049, China
Fund Project:  Supported by National Natural Science Foundation of China(11175193, 11275221)

Abstract: The fast extraction kicker system is one of the most important accelerator components and the main source of impedance in the Rapid Cycling Synchrotron of the China Spallation Neutron Source. It is necessary to understand the kicker impedance before its installation into the tunnel. Conventional and improved wire methods are employed in the impedance measurement. The experimental results for the kicker impedance are explained by comparison with simulation using CST PARTICLE STUDIO. The simulation and measurement results confirm that the window-frame ferrite geometry and the end plate are the important structures causing coupling impedance. It is proved in the measurements that the mismatching from the power form network to the kicker leads to a serious oscillation sideband of the longitudinal and vertical impedance and the oscillation can be reduced by ferrite absorbing material.

    HTML

Reference (28)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return