×
近期发现有不法分子冒充我刊与作者联系,借此进行欺诈等不法行为,请广大作者加以鉴别,如遇诈骗行为,请第一时间与我刊编辑部联系确认(《中国物理C》(英文)编辑部电话:010-88235947,010-88236950),并作报警处理。
本刊再次郑重声明:
(1)本刊官方网址为cpc.ihep.ac.cn和https://iopscience.iop.org/journal/1674-1137
(2)本刊采编系统作者中心是投稿的唯一路径,该系统为ScholarOne远程稿件采编系统,仅在本刊投稿网网址(https://mc03.manuscriptcentral.com/cpc)设有登录入口。本刊不接受其他方式的投稿,如打印稿投稿、E-mail信箱投稿等,若以此种方式接收投稿均为假冒。
(3)所有投稿均需经过严格的同行评议、编辑加工后方可发表,本刊不存在所谓的“编辑部内部征稿”。如果有人以“编辑部内部人员”名义帮助作者发稿,并收取发表费用,均为假冒。
                  
《中国物理C》(英文)编辑部
2024年10月30日

Get Citation
XIA Jia-Wen, YUAN You-Jin, LIU Yong, YANG Jian-Cheng, XU Hu-Shan, XIAO Guo-Qing, YANG Xiao-Dong, ZHANG Wei, GAO Da-Qing, ZHOU Zhong-Zu, MAO Rui-Shi, MAO Li-Jun, HE Yuan, XU Zhe, YANG Ya-Qing, XIAO Chen, YIN Da-Yu, ZHAO Tie-Cheng, WU Jun-Xia, LI Guo-Hong, LI Jie, LI Peng, LI Ke and HU Zheng-Guo. HIRFL-CSR commissioning in 2006 and 2007[J]. Chinese Physics C, 2009, 33(S2): 12-17. doi: 10.1088/1674-1137/33/S2/004
XIA Jia-Wen, YUAN You-Jin, LIU Yong, YANG Jian-Cheng, XU Hu-Shan, XIAO Guo-Qing, YANG Xiao-Dong, ZHANG Wei, GAO Da-Qing, ZHOU Zhong-Zu, MAO Rui-Shi, MAO Li-Jun, HE Yuan, XU Zhe, YANG Ya-Qing, XIAO Chen, YIN Da-Yu, ZHAO Tie-Cheng, WU Jun-Xia, LI Guo-Hong, LI Jie, LI Peng, LI Ke and HU Zheng-Guo. HIRFL-CSR commissioning in 2006 and 2007[J]. Chinese Physics C, 2009, 33(S2): 12-17.  doi: 10.1088/1674-1137/33/S2/004 shu
Milestone
Received: 2009-01-05
Revised: 1900-01-01
Article Metric

Article Views(4138)
PDF Downloads(733)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

HIRFL-CSR commissioning in 2006 and 2007

    Corresponding author: XIA Jia-Wen,

Abstract: 

HIRFL-CSR, a new heavy ion cooler-storage-ring system at IMP, had been in commissioning since the beginning of 2006. In the two years of 2006 and 2007 the CSR commissioning was finished, including the stripping injection (STI), electron-cooling with hollow electron beam, C-beam stacking with the combination of STI and e-cooling, the wide energy-range synchrotron ramping from 7 MeV/u to 1000 MeV/u by changing the RF harmonic-number at mid-energy, the multiple multi-turn injection (MMI), the beam accumulation with MMI and e-cooling for heavy-ion beams of Ar, Kr and Xe, the fast extraction from CSRm and single-turn injection to CSRe, beam stacking in CSRe and the RIBs mass-spectrometer test with the isochronous mode in CSRe by using the time-of-flight method.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return