• [1]

    . WANG Yi-Fang. The Construction of the BES0 Experi-ment. arXiv:hep-ex/0701010v12. BEPC/ Preliminary Design Report, 20023. LIU Jian-Bei et al. Nucl. Instrum. Methods, A, 2006, 557:436-4444. BAI J Z et al. (BES Collab.). Nucl. Instrum. Methods A,2001, 458: 6275. Crawford J.Nucl. Instrum. Methods, 1983, 211: 2236. Ohnishi Y. Track Parametrization, Belle note #1487. Jun-ichi Tanaka. Fast Tracker For the Drift Chamber, Bellenote #2228. LI Wei-Dong, LIU Huai-Min et al. The Offline Softeware inBES0 Experiment, Proceeding of CHEP06, Mumbai, 20069. Agostinelli S et al. (Geant4 Collab.). Nucl. Instrum. Meth-ods A, 2003, 506: 25010. DENG Zi-Yan et al. HEP NP, 2003, 27(10): 909-913(in Chinese)