• [1]

    ATLAS Collaboration, Phys. Lett. B, 716:1-29(2012)

  • [2]

    CMS Collaboration, Phys Lett. B, 716:30-61(2012)

  • [3]

    Acosta Darin and Ball Austin. CMS Technical Design Report for the Level-1 Trigger Upgrade. CERN-LHCC-2013-011, CMS-TDR-12:1, 2

  • [4]

    ATLAS Collaboration, Technial Design Report for the Phase-I Upgrade of the ATLAS TDAQ System. CERN-LHCC-2013-018, ATLAS-TDR-023-2013:1-2

  • [5]

    H Xu, ZA Liu et al, An ATCA-based high performance compute node for trigger and data acquisition in large experiments. Physics Procedia 37:1849-1854

  • [6]

    Zhen-An Liu. Basic idea on Concentrator, CMS L1 Trigger Meeting (July 92013)

  • [7]

    PICMG, Micro Telecommunications Computing Architecture Base Specification (July 6, 2006), p.1-8

  • [8]

    PICMG. Advanced Mezzanine Card Base Specification (November 15, 2006), p.3-1

  • [9]

    https://www.rogerscorp.com/documents/726/acm/RO4000-Laminates-Data-sheet.pdf, retrieved 1st October 2015

  • [10]

    David E and Bockelman, IEEE Transactions on Microwave Theory and Techniques, 43:7(1995)

  • [11]

    https://www.silabs.com/Support%20Documents/TechnicalD-ocs/Si5326.pdf, retrieved 1st October 2015

  • [12]

    P. Moreira and T. Toifl, Gigabit Optical Link Transmitter Maual, Version 1.9(2005)